|
Microsoft Project 2007 Basic
1.0 Reviewing the Workspace 1.1 Overview of the Commands 1.2 Browsing the Formatting Tool Bar 1.3 Reviewing the Standard Tool Bar 1.4 Enabling the Project Guide 2.0 Getting Started 2.1 Determining the Elements of the Project 2.2 Creating a Blank Project 2.3 Setting a Start Date 2.4 Inputting Project Tasks 2.5 Saving a Project
3.0 Adding Project Details 3.1 Organizing Tasks 3.2 Scheduling Tasks 3.3 Specifying People (Resources) 3.4 Re-Saving the Project 4.0 Editing Text 4.1 Checking Spelling 4.2 Adding a Detailed Style 4.3 Changing the Font Attributes 4.4 Using Cut, Copy and Paste
5.0 Editing Tasks 5.1 Editing a Task’s Duration 5.2 Inserting a Task 5.3 Removing a Task 5.4 Making a Task a Recurring Task
6.0 Reviewing the Project 6.1 Creating a Calendar 6.2 Changing the Calendar View 6.3 Using Zoom 6.4 Viewing the Gantt Chart 6.5 Using Print Preview
7.0 Reporting 7.1 Enabling the View Bar 7.2 Displaying a Resource Graph 7.3 Displaying a Budget Cost Visual Report 7.4 Displaying a Project Summary Report 7.5 Printing the Project Summary Report
Microsoft Project 2007 Intermediate
1.0 Managing Multiple Projects 1.1 Opening an Existing Project 1.2 Splitting the Project View 1.3 Creating an Additional Project 1.4 Arranging Two Projects within a Window
2.0 Formatting Page Layout 2.1 Editing Page Margins 2.2 Creating a Page Header 2.3 Creating Page Footer 3.0 Saving Files 3.1 Enabling Auto-Save 3.2 Saving a File in Another Format 3.3 Editing Save Options 3.4 Providing File Properties for a Project
4.0 Using Templates 4.1 Opening a Template 4.2 Creating a Template from an Existing Project 4.3 Previewing a Template
5.0 Managing Data 5.1 Enabling Auto-Filter 5.2 Filtering Data 5.3 Sorting Data
6.0 Managing Resources 6.1 Allocating Working Time for a Resource 6.2 Editing the Resource Calendar 6.3 Providing a Task with a Specific Resource 6.4 Deleting a Resource
7.0 Setting Project Parameters 7.1 Setting a Deadline for a Project 7.2 Establishing a Constrain for a Task 7.3 Creating a Baseline 7.4 Viewing the Baseline 7.5 Creating an Interim Plan 7.6 Viewing the Interim Plan
8.0 Resource Conflicts & Leveling 8.1 Identifying Resource Conflicts 8.2 Reassigning Resources 8.3 Leveling Calculations 8.4 Establishing Leveling Range
9.0 Reporting 9.1 Generating Reports from the Project Guide 9.2 Displaying a “What Does What When” Display Report 9.3 Displaying a Task Status Visual Report 9.4 Printing the Task Status Visual Report
Microsoft Project 2007 Advanced
1.0 Managing Resources 1.1 Using the Resource Information Dialogue Box 1.2 Using the Project Guide Task Pane 1.3 Grouping Resources 1.4 Managing Resources with the Task Usage View
2.0 Tracking Resources 2.1 Utilizing the Resource Management Toolbar 2.2 Using the Resource Graph View 2.3 Using the Resource Usage View 2.4 Scheduling Overtime for Resources
3.0 Managing Tasks 3.1 Updating Calculation Settings 3.2 Organizing a Task by Phase 3.3 Using the Task Views 3.4 Creating Task Calendars 4.0 Linking Tasks 4.1 Linking Tasks within a Project 4.2 Linking Tasks in Two Projects 4.3 Unlinking Tasks
5.0 Editing Tasks 5.1 Editing Start and Finish Dates 5.2 Editing the Work Remaining for a Task 5.3 Editing the Duration of a Task 5.4 Completing a Task
6.0 Reporting 6.1 Using the View Bar to Generate Reports 6.2 Customizing an Existing Report 6.3 Using the Reports Dialogue Box 6.4 Creating a Report Template 6.5 Creating a Report from the Project Guide
7.0 Customizing the Workspace 7.1 Adding Toolbars 7.2 Hiding Toolbars 7.3 Customizing Toolbars 7.4 Adding Menus
8.0 Closing a Project 8.1 Using the Drawing Tool Bar 8.2 Tracking Overdue Tasks 8.3 Tracking Completed Tasks 8.4 Updating the Project
|